This was a challenging project because the new building had to be constructed on a steep hillside. The materials used for the partially below grade parking garage is steel-reinforced concrete, and the above ground office levels are structural steel with a concrete core.
This was a challenging project because the new building had to be constructed on a steep hillside. The materials used for the partially below grade parking garage is steel-reinforced concrete, and the above ground office levels are structural steel with a concrete core.